Sign In Get Early Access

Early-Access Program

Planners who see the warehouse floor six weeks early

Results from the Routeharvest early-access program. Mid-market manufacturers and distributors who replaced the Monday spreadsheet with a weekly forecast in their inbox.

Pilot program outcomes

~34%
Fewer stockouts across early-access manufacturers

Measured against the 12 weeks before Routeharvest integration, same SKU catalog

4 hrs
Monday planning time saved per planner per week

Across pilot teams averaging 250 active SKUs per planner

Same day
Average ERP integration setup time for supported connectors

No data engineering team required in any pilot integration

Pilot case studies

Kellbridge Industrial Supplies
Industrial hardware distribution

A mid-size industrial hardware distributor operating three distribution centers, approximately 1,200 active SKUs, and a two-person planning team. Monday planning was taking the entire morning.

Kellbridge connected Routeharvest to their Orion ERP on day one. Within the first two weeks, the weekly plan was landing in the planning team's inbox every Friday afternoon, covering all three DC locations at the SKU level.

Monday time
Cut from 4 hours to a 15-minute inbox review
Stockout alerts
3 caught in first month, all with 5+ week lead time
The stockout alerts alone paid for the first three months. The Monday reconciliation time was a bonus.

Director of Supply Planning, Kellbridge Industrial (early-access pilot)

Varela Food Systems
Regional food-service manufacturing

A regional food-service manufacturer with significant seasonal demand variation, two production facilities, and a distribution network covering four Midwest states. The seasonal planning window was a recurring crisis each year.

Varela integrated Routeharvest with their Cadence ERP and Nexbridge WMS. The per-SKU seasonal ramp modeling surfaced a pre-season overstock risk on three lines that had not been visible in the category-level plan.

Overstock risk
3 product lines flagged before the pre-season PO was placed
SKU granularity
Regional DC-level forecasts replaced category aggregate
The SKU-location granularity was the part I did not expect. Our previous tool gave us category-level forecasts that missed the slow-moving SKUs at regional DCs.

VP Operations, Varela Food Systems (early-access cohort)

More from the pilot program

I was skeptical about same-day integration. We had been told that before and it always meant three weeks of IT tickets. Routeharvest was actually live in a single morning. Read-only credentials, pointed at the ERP, done.
Senior Supply Chain Planner, Midwest auto-parts distributor (pilot program)
What surprised me was the dead inventory side. We were focused on stockouts, but the first report flagged four SKUs at our Denver DC that were running at 20% of model velocity. We would have ordered another run before catching it ourselves.
Director of Operations, specialty chemical distributor (early-access cohort)
We have two planners for 850 SKUs across five locations. The Monday rebuild was half their week. Now it is a 20-minute review. They are spending the saved time on supplier relationship issues that actually needed human attention.
COO, regional building materials distributor (pilot program)

Become an early-access partner

The early-access cohort is open now. Connect your ERP and get a live forecast within 48 hours. No long onboarding, no dedicated data team.

Get Early Access