Early-Access Program
Planners who see the warehouse floor six weeks early
Results from the Routeharvest early-access program. Mid-market manufacturers and distributors who replaced the Monday spreadsheet with a weekly forecast in their inbox.
Pilot program outcomes
Measured against the 12 weeks before Routeharvest integration, same SKU catalog
Across pilot teams averaging 250 active SKUs per planner
No data engineering team required in any pilot integration
Pilot case studies
A mid-size industrial hardware distributor operating three distribution centers, approximately 1,200 active SKUs, and a two-person planning team. Monday planning was taking the entire morning.
Kellbridge connected Routeharvest to their Orion ERP on day one. Within the first two weeks, the weekly plan was landing in the planning team's inbox every Friday afternoon, covering all three DC locations at the SKU level.
The stockout alerts alone paid for the first three months. The Monday reconciliation time was a bonus.
Director of Supply Planning, Kellbridge Industrial (early-access pilot)
A regional food-service manufacturer with significant seasonal demand variation, two production facilities, and a distribution network covering four Midwest states. The seasonal planning window was a recurring crisis each year.
Varela integrated Routeharvest with their Cadence ERP and Nexbridge WMS. The per-SKU seasonal ramp modeling surfaced a pre-season overstock risk on three lines that had not been visible in the category-level plan.
The SKU-location granularity was the part I did not expect. Our previous tool gave us category-level forecasts that missed the slow-moving SKUs at regional DCs.
VP Operations, Varela Food Systems (early-access cohort)
More from the pilot program
Become an early-access partner
The early-access cohort is open now. Connect your ERP and get a live forecast within 48 hours. No long onboarding, no dedicated data team.
Get Early Access